Pine Cone Press-Citizen | Longville, MN
weather sponsored by


Advanced Search
search sponsored by


Local News
Cass County News
Sports
Obituaries
Events
Letters to the Editor
Reader Submissions
Classifieds
Outdoors
Community Links
School News
City Council Minutes
Opinion
Legal Notices
Get Connected In Longville
Photo Gallery
Life
Extras
Contact Us



Guidepoint Pharmacy

home : cass county news : cass county news
June 23, 2018

5/19/2018 8:35:00 AM
Gull Lake Trail cooperative agreement extended for three years
MONICA LUNDQUIST
Cass County Correspondent

BENA - Cass County commissioners voted Tuesday to extend a cooperative agreement for the Gull Lake Walking and Biking Trail with Crow Wing County; the cities of East Gull Lake and Nisswa, and Fairview Township.

The agreement was initiated in 2010 and extended in 2015. Tuesday's vote calls for another three-year extension.

Lake Shore, East Gull Lake and Fairview already have signed the extension.

Cass Highway Department moved a metal cold storage building to its Walker highway garage site. When the building was reassembled, the roof was bolted onto the frame where it needed to be attached rather than where old holes had been when the roof was attached at its prior location.

County Engineer Darrick Anderson told the county board Tuesday rainwater runs into the building through those old holes. He proposed replacing the roof with the lower of two bids from Srock Construction at a cost of $75,375.

The board also authorized Anderson to reinforce the floor in a small corner of that building and to create a heated and cooled small building within the building.

That area will then be used to store the county's election equipment, so the county can stop renting space from a private building owner for its election equipment.

Minnesota Custom Concrete will do the cement work for $3,418.65. Action Contacting will build the structure for $24,800. RW Electric will wire it for $3,282. Anderson Heating and Air Conditioning will install the heating and cooling system for $5,500.

The entire $38,850.65 project represents the lower of two quotes for each phase.

Knife River Materials submitted the lowest of four bids for a joint road improvement project with Cass County, the city of Walker and Shingobee Township at $4,798,132.33.

Pavement will be reclaimed, grading done, new pavement laid and culvert work done on county state aid highways 12, 38, 61 and 66 and some Shingobee town roads around Walker.

Second publication rights after Brainerd Dispatch.


Bill Hansen Realty




Article Comment Submission Form
Please feel free to submit your comments.

Article comments are not posted immediately to the Web site. Each submission must be approved by the Web site editor, who may edit content for appropriateness. There may be a delay of 24-48 hours for any submission while the web site editor reviews and approves it.

Note: All information on this form is required. Your telephone number is for our use only, and will not be attached to your comment.
Submit an Article Comment
First Name:
Required
Last Name:
Required
Telephone:
Required
Email:
Required
Comment:
Required
Passcode:
Required
Anti-SPAM Passcode Click here to see a new mix of characters.
This is an anti-SPAM device. It is not case sensitive.
   











Hackensack Lumber
Stepping Stones
Woodland Insurance
Life
Pat Boen & Dave Owen Realtors


Pine Cone Press-Citizen • PO Box 401 • Longville, MN 56655 • Phone: 218-363-2002

Software © 1998-2018 1up! Software, All Rights Reserved